Appendices
System Setup Checklist
A. Power
(24) VDC power at least 300 mA.
Polarity correct.
Local display ON. If not, check power supply.
B. System Communications (if connected to a remote computer)
RS-485 converter properly installed or attached to computer.
Signal polarity correct.
Modbus device address set in StarPac device; refer to StarPac Operation section.
Start software; refer to software section.
Configure communications in software and hardware to match. Refer to Initial Setup in The
StarTalk II portion of this manual and StarPac Operation section.
Communications work. If not, recheck settings.
C. Calibration checks
Air supply turned on.
Check status screens to verify system calibration; refer to software section.
Valve stroke calibration to remove installation and handling offsets; refer calibration section.
Verify process sensor calibration; recalibrate if needed.
D. System Configuration; refer to engineering/configuration section for details
Set or verify failure modes.
Set or verify analog output.
Set or verify command and mode source
Set or verify stroke limits.
Set or verify LCD display options.
Check positioner response and set gain to control speed.
E. Automatic PID Operation; refer to Engineering/Tuning section
Select process variable.
Input full scale range.
Set initial PID parameters.
Begin Automatic mode and tune system.
F. Other Options; refer to Engineering section
Set units.
Reset totalizer.
Set or verify tagname.
Set and start Data Logger function.
Collect and save installed signature, if desired.
G. Save Installed Configuration; refer to technician support section
Save configuration.
Make backup copy and archive.
StarPac II User Interface Manual 28