Flowserve NRA 1-3 Manual do Utilizador Página 21

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 24
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 20
21
NRA 1-3
Decommissioning
First disconnect the supply voltage and pull the cable out of the cable gland. Then disconnect the
measuring electrodes and pull the electrode cables out of the cable glands.
De-install the test station.
Danger
The terminal strips of the test station NRA 1-3 are live during operation.
This presents the danger of electric shock.
Always cut off power supply before mounting, removing or connecting the terminal
strips!
NRA 1-3
Disposal
De-install the test station NRA 1-3 and separate the waste materials, using the materials
specifications.
Dispose of electronic components (boards) separately.
For the disposal of the test station observe the pertinent legal regulations concerning waste disposal.
Vista de página 20
1 2 ... 16 17 18 19 20 21 22 23 24

Comentários a estes Manuais

Sem comentários