Flowserve CPM Series Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Hardware Flowserve CPM Series. Flowserve CPM Series User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 12
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
Installation
Instructions
Experience In Motion
CPM Series
Dual, cartridge mounted, flexible stator pusher
seal designed for general service applications
CPM PP
Vista de página 0
1 2 3 4 5 6 ... 11 12

Resumo do Conteúdo

Página 1 - Instructions

Installation InstructionsExperience In MotionCPM SeriesDual, cartridge mounted, flexible stator pusher seal designed for general service applicationsCP

Página 2 - 1 Equipment Check

104 Operational Recommendations4.1 Do not exceed corrosion limits. The CPM PP seal is designed to resist corrosion by most chemicals. However, do n

Página 3 - Figure 1

115 RepairThis product is a precision sealing device. The design and dimension tolerances are critical to seal performance. Only parts supplied by Flo

Página 4

TO REORDER REFER TOB/M #F.O.FIS165eng REV 01/09 Printed in USAflowserve.comTo find your local Flowserve representativeand find out more about Flowserve C

Página 5 - Connections

2DescriptionThe CPM PP seal is a cartridge mounted mechanical seal, designed for ease of installation and reliable operation. No seal setting dimensio

Página 6 - 2 CPM PP Installation

3Seal Chamber Requirements Figure 11.5 Check equipment dimensions to ensure that they are within the

Página 7 - Figure 5

4CPM PP Dimensional Data (inches) for standard bore seal chambers Figure 2ADCG KFJ19 15 14

Página 8 - 3 Piping

1.375 2.000 2.385 2.625 4.000 2.008 2.070 2.146 2.208 3.212 0.531 1.750 2.500 2.760 3.000 5.500 2.008 2.070 2.146 2.208 3.587 0

Página 9

62 CPM PP InstallationNote: No seal setting measurements are needed to install the CPM PP seal. Instructions are for vertically split case end-sucti

Página 10

7 2.5 Position the CPM PP with the gland tight against the seal chamber face. Turn the gland so that the barrier taps are positioned so that the as

Página 11 - 5 Repair

8 Inlet Outlet Clockwise (CW) Port c Port b Counterclockwise (CCW) Port b Port c Shaft rotation from exposed end of gland

Página 12 - TO REORDER REFER TO

93.3 For dual seal un-pressurized operation, supply a clean compatible buffer uid to the inlet port at a pressure below the stufng box pressure. See

Comentários a estes Manuais

Sem comentários