NRG 211-1
A Siebe Group Product
Installation Instructions 810425-00
Level Probe Type NRG 211-1
Vista de página 0
1 2 3 4 5 6 ... 21 22

Resumo do Conteúdo

Página 1 - NRG 211-1

1NRG 211-1A Siebe Group ProductInstallation Instructions 810425-00Level Probe Type NRG 211-1

Página 2 - Dimensions

10Technical data – level probeWeightLevel probe approx. 5.6 kgWelding standpipe approx. 4.5 kgTechnical data – preamplifierCaseTerminal box made of al

Página 3 - Parts Drawings

11InstallationWelding standpipeWeld standpipe inclined upwards by at least 5° onto vertical pipe to ensure that thestandpipe can completely empty if t

Página 4

12NotenThe joint ring has serrated faces and silver coated rings at both endswhich must not be removed.ToolsnOpen-end spanner, A. F. 27 mmnScrewdriver

Página 5

13WiringWiring diagramUse screened three-core cable, min. conductor size 0.5 mm², max. length 500 m.1. Lift up the retaining clip and remove the u

Página 6 - Contents

14Supply voltage 12 V DCMeasuring voltage 1– 10 V DCPinsFor resistance measurement: strip off conductorFor resistance measurement: Pt 1000Fixing screw

Página 7 - Contents – continued –

151. Switch on the mains supply and check whether the mains voltage is appliedacross the level switch. See installation instructions NRS 2-4 or NRS 2-

Página 8 - Important Notes

16Table 1 Measuring voltagesMeasuring voltage UMDecoding NRS 2-4 Decoding NRS 2-5≤ 0 V – 1 V Malfunction in probe Malfunction in probesupply line (sho

Página 9 - Explanatory Notes

171. Unscrew fixing screw and remove terminal box cover. Fig. 22. Withdraw all terminals from pins.3. Unscrew fixing screw and remove board. F

Página 10

18AnnexFault finding listWarningThe terminal strip of the NRS 2-4 /NRS 2-5 is live during operation. Thispresents the danger of electric shock.Cut off

Página 11 - Installation

19Fault: Defective temperature sensor.Remedy: Check the measuring voltage across terminals 2 and 3 of NRG 211-1.If the supply voltage 1 – 4 V check te

Página 12 - Installation – continued –

2DimensionsFig. 1~80~118∅ 43.5334.547897

Página 13 - NRV 2-30

20We hereby declare that the equipment NRG 211-1 conforms to the followingEuropean guidelines:nLV guideline 73/23/EWG version 93/68/EWGnEMC guideline

Página 14

21Examples of InstallationBy customerWelding standpipe (GESTRA)BAKeyFig. 58788DN ≥ 100/4"DN ≤ 100/4"≈24∅ 63.5≈12∅ 63.5

Página 15 - Commissioning

22GESTRA Gesellschaften · GESTRA Companies · Sociétés GESTRA · Sociedades Gestra · Società GESTRAVertretungen weltweit · Agencies all over the world ·

Página 16 - RESISTANCE VALUES

3Parts DrawingsFig. 2I JKHGACEDBFLMNO

Página 17 - Maintenance

436251440Parts DrawingsFig. 35HP Q G R S

Página 18 - MALFUNCTION IN PROBE and

5StrainerMeasuring electrodeStuffing boxGroove for gasketLocking screwTransit protectionUpper part of connectorRetaining clipLower part of connectorFi

Página 19 - Annex – continued –

6ContentsSafety note...8Danger ...

Página 20

7Contents – continued –Note ...

Página 21 - Examples of Installation

8Important NotesSafety NoteDangerWhen loosening the electrode live steam or hot water might escape.This presents the danger of severe injury. It is th

Página 22 - GESTRA GmbH

9Explanatory NotesSystem descriptionThe capacitance level probe NRG 211-1 serves as sensor for the level switchNRS 2-4 (high level) / NRS 2-5 (low lev