3. Cut away the foil shield. Strip the insulation from the conductors approximately 0.4 inch (1 cm)
as shown in Figure 2.11.
Figure 2.11 – Stripping Conductors
Figure 2.12 – Applying Heat Shrink Tubing
4. Apply heat shrink tubing to insulate the braided shield and to provide stress relief to the cable as
shown in Figure 2.12.
a CAUTION: Do not melt the insulation.
5. Install ring tongue connectors as shown in Figure 2.13.
NOTE: Flowserve recommends the use of Thomas and Betts #RZ22-6 for optimum results.
Figure 2.13 – Ring tongue connectors